Coming home from work.
"Parks and gardens will cover 58% of the plot, which is only 6.3% of the total costs."
46 families in 9 houses with 1 big sunny garden

Sell finished homes or developed plots

Plots were studied for maximal use of space under municipality rules. Feasiblity study makes parcels so you can sell them seperately–as built or plot with developed plan with permit.

No drama with municipality

Zoning and access are resolved. You get the feasibility, optimized parcel plan, road design, and a clear cost model with the main drivers. Project in accordance with permit application, but can still be adjusted. What you see is what you can build.

Rare apartments on market

Bright rooms, looking on three sides of apartment towards sunny garden. 34% bigger rooms than required by standard, so children rooms can also take teenager. And balconies where you can dine with 5 of your friends, and still have space for a grill, bartheke and lounge chair.

58% of the plot will be park, gardens and children's playgrounds.
Romance in the view, rigor in the numbers.
Planned land, faster returns.

Build Potential

Plots are combined area of 20 546 m² on which you can build maximum 46 apartments. You can build 38% of the plot which was maxed out. With one distribution line and two buildings types, construction is simplified and tasks concentrated. Parks and gardens will cover 58% of the plot, which is only 6.3% of the total construction costs.

Zoning Fit

Land meant for living, so no need to wait for change of the use. Plots will need special planning document (OPPN), for which the development study can be used, as it follows required limitations from the main municipality document (OPN). For example–as instructed buildings are wide 12 meters and 8 meters deep. We then designed apartments with three sided orientation for bright apartments, this is very rare on the market.

Views & Privacy

14% of the plot is meant for interior living while 86% of the plot are gardens, playground, picnic areas–one big park with a couple of houses in it really. Each apartment gets 391 m2 of garden, but as there are no fences feels like you own the place. While 300% more efficient use, meaning much more people per m2, the distance between them is bigger then 10 meters, and two trees per usual.

Access & Roads

Edge of plots its linked to the regional road, but it’s not positioned besides it, meaning no noise on the plots. Plot is directly linked to the regional road so no easement or right of use needed. You can access your plot right from the road without asking for permission. Each apartment needs minimum 3 parking spaces, a lot, but we planned them with dual use for the future, as gardens or children’s playground.

Boundaries Verified

New Development is prepared according to the limitations of the Municipality, 4m distances from neighboring plots, safety corridors around the infrastructure lines and distance from the train tracks. Buildings are as high as possible at 10,3 m, and positions for maximal sun exposure.

As Found

Family houses on three sides of the plot, train track on the south. Store is halfway to the primary school, to where is 15 minute walk, 22 with small kids, to the south. Bus statin is right besides the plot, so you can think about if you really need a car. Or if you want to go further, you can catch a train in 12 minutes on foot.

Power & Sustainability

The big 3–electricity, waster and drinking water– are ready to plug-in by the edge of the plot. All 9 buildings will be fed by one continuous distribution line. No need for branched and expensive digging all over the site. This means that each building will be independent with it’s own plug - easy to sell separately.

Topography & Drainage

Ground is almost flat with 3.5° inclination towards south. Site is naturally drained towards the edge of the plots. There is no moss on site, which is indicator for damp and acid ground, but meadow flowers and high grass.

Cost Drivers

Plot is 18.5% from the potential total construction costs, if you decide to build. Through low maintenance and passive design of the buildings, we also paid attention to the right position of rooms, technical systems are reduced to 10.8%, while usually these are more in the range of 20%. Facades, external windows and railings, also sunshadings are 8.6% of the total, they are keeo simple and widely available, with focus on durability.

Title Clean

Plots are free from any right’s of use, no need to discuss anything with neighbors. The plan you get is the plan you can start building immediately without checking opinions from others.

Orientation & Sun

Spread wide parallel with east-west axis site gains from the south sun through the whole day. Because there is only train track in front the view you buy is the view you will keep. That means that also during winter each part of the site gets it’s 8 hours of direct sunlight. With big windows towards south and high mass floors in concrete during winter houses gain free temperature gain–what passive house should be like.

Nearby Services

Family houses on three sides of the plot, train track on the south. Store is halfway to the primary school, to where is 15 minute walk, 22 with small kids, to the south. Bus statin is right besides the plot, so you can think about if you really need a car. Or if you want to go further, you can catch a train in 12 minutes on foot.

2 types, 9 multi-family houses with each on its own plot. Can be sold separately.
What you can build and what it costs
Development strategy and Cost estimation

Room program

Apartment floor plans are open and adaptable, allowing the space to accommodate different ways of living. Centrally positioned stair cores enable a rational organization of the apartments. The units combine conventional windows with sills and floor-to-ceiling glazing, providing abundant daylight and effective natural ventilation. The basement level is dedicated to storage rooms, shared technical spaces, and a laundry, reducing the need for technical service elements on the residential floors. Balconies and terraces on the rear side offer private outdoor areas with views of the green backdrop, significantly enhancing living quality.

Construction

The structural system combines the strength of reinforced concrete with the lightness of aerated-concrete construction (AAC), achieving a balance between stability, thermal efficiency, and sustainability. The basement levels are built as monolithic reinforced concrete, ensuring load-bearing capacity and lasting watertightness, while the above-ground floors use aerated-concrete blocks for fast, precise, and energy-efficient construction. The façade is finished with a mineral render that blends harmoniously with the surroundings and conveys a calm material aesthetic. The overall structural concept follows principles of economy, robustness, and adaptability, ensuring a long service life and low maintenance costs.

Building technology

The building systems are based on the principles of simplicity, energy efficiency, and long-term durability. Passive strategies—good thermal protection, thoughtful orientation, and the possibility of natural ventilation—significantly reduce dependence on mechanical systems. Heating is provided by a low-temperature air-to-water heat pump that distributes warmth through underfloor heating, ensuring even thermal comfort and low energy use. Mechanical ventilation is planned only for sanitary rooms and the basement, while living spaces are designed for natural air circulation. This approach lowers technical complexity while increasing reliability, energy performance, and the project’s environmental responsibility.

Essential quantities
swiss standard SIA 416 (2020)

GSF
Plot area
100%
20'536
GGF
Building plot area
13.7%
2'809
UF
Surrounding area
86.3%
17'727
BUF
Processed surrounding
56.5%
11'608
UUF
Unprocessed surrounding
29.8%
6'119
GV
Building volume
-
27'107
GF
Total floor area
100%
7'714
NGF
Net floor area
81.9%
6'316
KF
Structural area
18.1%
1'398
VF
Traffic area
9.9%
762
FF
Functional area
2.0%
157
HNF
Main usable area
70.0%
5'397
NNF
Additional usable area
0%
0
PP
Parking spaces
-
104
St

Construction costs ± 15%
swiss e-BKP-H (2020) in EUR

A
Land
-
To be agreed
B
Preparation
4.1%
689'000
C
Building Structure
13.2%
2'217'000
D
Building Services (MEP)
12.8%
2'155'000
E
Exterior Wall Cladding
10.4%
1'743'000
F
Roofing
2.6%
432'000
G
Interior Finishing
16.8%
2'831'000
I
Building Surroundings
8.9%
1'501'000
J
Building Furnishings
0%
0
V
Planning Costs
7.3%
1'215'000
W
Ancillary Costs
4.3%
718'000
Y
Reserve
1.4%
216'000
Z
Value Added Tax (VAT) 22%
22.0%
3'017'000
B-Z
Total Construction Costs
100.0%
16'734'000

Space & Energy

Average useful area per Apartment
137 m²
Garden’s area per Apartment
133 m²
Gardens, parks and playground / plot area
56%
Unused zoning potential
62%
60% of roofs for solar energy
1’685 m²
Annual production estimate
252’000 kWh/year
% energy needs covered by solar
122%

Returns & Yield

Rental net income after financing
1’050’000 EUR/year
Rental net income after loan payment
682’200 EUR/year
True rental yield after all costs
3.58%
Rental multiplier
28 years
Resale value
29’313’000 EUR
Resale net value after costs incl. financing
18’025’000 EUR
Resale multiplier or created value
1.54

Important Notice

This page is an information summary, not an offer or a contract. We built it from cadastral records, zoning plans, owner files, maps, and site walks. We believe it is correct, but we do not guarantee it. Numbers are approximate. Boundaries, access rights, easements, and areas must be confirmed by official extracts and a licensed surveyor. Zoning and approvals depend on the authority; the buyer must verify renovation and building rights before deciding. Costs are estimates based on Swiss eBKP-H (2020) with the shown allowances. Land price, taxes, and fees are extra unless stated. Returns and yields are scenarios, not promises. Markets and rules change. Neither we nor the owner accept liability for decisions made on this summary, and we may update or withdraw it at any time.